| |||||||
|
Location: Reading, Pennsylvania Scope of Work: The Parish House Addition, designed as an infill structure in a street front of row houses, creates an appropriate transition between the large scale elements of the existing church and the smaller scaled details of the adjoining residences. The facility provides much needed accessibility to the various levels of the existing church, church office, a library, classroom/meeting spaces, and conveniently located restrooms. Design Team: Howard Quaintance, AIA, Principal in Charge; Beitmen & Huyett, Inc., Mechanical/Electrical Engineers; Long,Tann & D'Onofrio, Inc., Structural Engineers General Contractor: Caldwell, Heckles, & Egan |
|
|---|---|---|
|
||
Copyright © 2007
Muhlenberg Greene Architects, Ltd.
|